1
EURO 2012. Kiev Olympic Stadium
108 double acting hollow bore cylinders of 220ton and 150mm stroke, and 60 cylinders of 120 ton and 150 mm stroke were manufactured for the construction of the new roof of the Olimpic Stadium in Kiev, where the Spanish Football Team won the EURO 2012.
-
2
6500 tonnes dragline lift in Australia
Using a computer controlled synchronous high-capacity lifting system, 7 cylinders of 500t capacity and 450mm stroke and 22 cylinders of 100t capacity.
-
3
Motorway construction
HS0403D/L synchronized powerpack with four pcs STX13004 cylinders used in the Supersur motorway construction in Bilbao (Spain)
-
4
Coil lifting
Coil lifting with two DL03075/L double acting telescopic cylinders, 30 tonne and 750 mm stroke
-
5
Bridge construction
Bridge construction in Deba (Spain) using two AC220144 jacks and a W00607 pump
-
6
AP-1 Motorway construction
AP-1 Eibar-Vitoria Motorway construction in Basque Country (Spain)